Table of Contents

Hábrók Changelog

This page records major changes to Hábrók, which are mostly carried out during scheduled maintenance periods. This changelog is kept since August 13th 2025, although changes have been made during past scheduled maintenance periods and on-demand as necessary.

2026-08-25

Starting 2nd phase of migration from Alma Linux 8 to Alma Linux 9. See gradual_migration_of_compute_and_logininteractive_nodes for the details. This introduces the following changes:

Maintenance 2026-08-03

The following changes were applied during the scheduled maintenance window:

2026-06-24

2026-05-26

2026-04-29

2026-04-13

2026-02-27

2026-02-18

2026-01-26

2026-01-06

2025-10-24

2025-09-18

2025-08-28

Maintenance 2025-08-11

The following lists the main changes applied in the Hábrók in the maintenance period from 11th August 2025 to 13th August 2025. These changes aim to generally improve the stability of the system, include previously released software patches and optimize performance of some aspects of the cluster.

A record of the real-time updates given during the maintenance period can be found in the associated status page entry.