Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
habrok:introduction:cluster_description [2025/03/05 14:12] – [Compute nodes] Correct clock speed for Digital Lab pedrohabrok:introduction:cluster_description [2025/04/08 15:06] (current) – [Compute nodes] Update V100 node info pedro
Line 39: Line 39:
 {{ :habrok:introduction:habrok_power_nodes.jpg?direct&150|Hábrók nodes with cables for power and network}} {{ :habrok:introduction:habrok_power_nodes.jpg?direct&150|Hábrók nodes with cables for power and network}}
  
-  * 18 GPU nodes (Delivered by Fujitsu in an earlier purchase) with the following components: +  * 19 GPU nodes (Delivered by Fujitsu in an earlier purchase) with the following components: 
-    * 18 cores @ 2.7 GHz (two Intel Xeon Gold 6150 CPUs)+    * 36 cores @ 2.7 GHz (two Intel Xeon Gold 6150 CPUs)
     * 768 GB memory (621 GB used for temporary disk space)     * 768 GB memory (621 GB used for temporary disk space)
-    * Nvidia V100 GPU accelerator card with 32 GB RAM+    * Nvidia V100 GPU accelerator cards each with 32 GB RAM
     * 621 GB RAM disk     * 621 GB RAM disk
  
Line 57: Line 57:
     * 440 GB internal disk space     * 440 GB internal disk space
     * 4 Nvidia H100 GPU accelerator cards with 80 GB RAM     * 4 Nvidia H100 GPU accelerator cards with 80 GB RAM
-    * Only accessible for education purposes in the scope of the Digital Lab project+    * Only accessible for education purposes in the scope of the [[https://myuniversity.rug.nl/infonet/medewerkers/fse/education/who-is-who/sse-teachers-and-x-lab-teams/digital-lab|Digital Lab project (employee login required)]]
  
 ===== Network ===== ===== Network =====